We designed infrastructure upgrades focused on reducing the environmental footprint of ongoing operations, including emissions capture improvements and more efficient energy recovery systems. The upgrades were phased in without interrupting production, and post-implementation monitoring confirmed the targeted emissions reductions.
- Location: Warri, Delta State, Nigeria
